I-17 Black Canyon
Project Card
Peoria Avenue to Greenway Road TRAC # H6602
RTP Phase 1 Project Description The scope of this project is to replace the existing pump stations at the Interstate 17 Black Canyon Freeway traffic interchanges at Greenway Road, Thunderbird Road, Cactus Road, and Peoria Avenue with a gravity storm drain system. The project includes installation of 30- to 90-inch diameter reinforced concrete pipe (RCP) along Interstate 17 frontage road, two detention basins at the Interstate 17 and Thunderbird Road TI, pavement replacement on the frontage road, signing, striping, improvements to ADA features within the project area, and removal of the four existing pump stations.
Project Benefits The gravity storm drain system will discharge the storm water into the Arizona Canal Diversion Channel (ACDC).
Schedule
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
Voter Approval
Open to traffic
Programmed Completion Date
Cost