71st Avenue to Grand Canal Bridge TRAC # H636301
RTP Phase 1 Project Description The project focused on the travel lanes in the nearly seven mile stretch between 71st Avenue and the Grand Canal Bridge near 31st Avenue. All existing asphalt was milled up and then repaved with rubberized asphalt.
Project Benefits Because rubberized asphalt was used, area residents benefitted from reduced traffic noise and drivers were afforded with a smoother ride.
Schedule
2003
2004
2005
2006
2007
2008
Voter Approval
Open to traffic
Programmed Completion Date
Cost
Volumes